Milestone Infrastructures trial of INSTABOOM Go demonstrated significant safety and cost benefits, along with ease of use, leading to Milestone retaining all 3 units and rolling out deployment to other depots.
Reading Borough Council saw dramatic improvement of safety of operatives and public when they used INSTABOOM Go at remote operated Stop:Go system. removing those operatives from the road and out of harms way.
Solar Gates UK is delighted to have been chosen by SCS to secure and protect their HS2 construction worksites. With over 20 SOSEC barriers across the site, up to 4 SOSEC barriers protect each entrance, creating a secure two-way traffic airlock. The huge scale of the HS2 project means that security and health and safety of the sites needs to be of the highest standard and construction areas need to be kept extremely secure.
Sebastian Briere-Edney, Chief Buyer for Linden Homes said: “Solar Gates UK, have been great to deal with, the barrier was easy to install and worked straight away".
Balfour Beatty Vinci JV calculate savings of £2.4m by utilising INSTABOOM barriers and dramatically cut incursion and improve worker safety on the M4 SMART motorway J3-12 project.
“The personal service by Solar Gates UK is second to none. I have known and worked with Neil Sampson (MD) for 15 years now, I rely on the team and the 24/7 offering is more reliable than other companies can offer.”
Balfour Beatty Vinci JV calculate savings of £2.4m by utilising INSTABOOM barriers and dramatically cut incursion and improve worker safety on the M4 SMART motorway J3-12 project.
When a clients with a very specific brief approached us, asking for driveway gates and an infill panel with a unique bulrush design, which we were only too pleased to create a unique gate for them.
Kier Living was seeking a solution to their ‘no one shut’s the gate’ problem. Using SOSEC barriers on Kier sites has allowed them to cut site security costs, improve public demarcation, reduce HSE interventions.
The latest innovation from INSTABOOM is a unique GS6 over height warning and asset protection system for highways and railways that physically closes a work lane as a breach is detected.
Three problems were solved when Solar Gates worked with Triptych Logistics, on a secure storage unit for the Saatchi Gallery. The insurers required a secure, gated compound around the building, the solution needed to fit within a tight space and all within a tight budget.
The SOSEC solar barrier has allowed us to make considerable saving on our site security costs, we certainly would not want to go back to the old, labour intensive, methods of securing the site
INSTABOOM barriers integrated to standard traffic signal crossing system secure haul route crossing making ELOR site safer and greener.
“The new bollards have improved the image of the whole garage. Customers have noticed, staff feel more secure and everyone drives more carefully. It is win-win all round” comments Colin Rate, senior owner, Rates Ford.
Site manager Tom Holmes, said “The barrier improved things instantly and is doing the job we need it to".
“The SOSEC mobile barrier was perfect for the urgent yet temporary need that we faced at the castle” explained Kelvin Wood, Security Manager, Leeds Castle.
“The most important benefit to the school is that there are no running costs. I have been very pleased with the communication from the start of the project. I would recommend Solar Gate to anyone.” explains Mr. Foryan.
“I am so glad that we chose to work with Green Gate. It was amazing leaving work on a Friday and coming back on Monday morning to find our new double barriers and pavement up and working!”, explained Rebecca Hampshire, Corporate Offices Building Manager, Care UK.